Elgin O'Hare Western Access (EOWA) Interchange

Client:

Illinois State Toll Highway Authority

Project Type:

  • Engineering & Design
  • Project Management

Location:

Chicago

About the Project

Complexities abound in O’Hare Airport interchange design

The Elgin O’Hare Western Access (EOWA) Interchange is the centerpiece of the Illinois Tollway’s ongoing $3.6 billion EOWA program which aims to improve connections between O’Hare International Airport and surrounding communities, reduce travel times and ease local road congestion. As a critical component of this transformative initiative, Stanley Consultants designed a key tri-level interchange that will connect Illinois Route 390 with the new I-490, creating vital access to the west side of O’Hare International Airport. Delivered in multiple construction packages at varying stages of completion, the project highlights innovation in engineering and infrastructure development.

The scope of the project includes new high-capacity ramps, consisting of six flyovers and nine new ramp bridges, as well as local road relocations, new retaining walls and culverts, extensive earthwork and soil treatment. It also required complex stormwater detention systems, the relocation of Willow Creek and its floodplain and the installation of traffic signals, signing, lighting, tolling and intelligent transportation systems. Additional elements included major utility relocations, the relocation of airport navigation aids and runway approach lighting systems and extensive traffic control measures. The system interchange is within O’Hare right-of-way and airspace and is constructed over two Class I railroads, local roads and major utilities requiring significant stakeholder coordination and approvals.

Stanley Consultants has completed the design of two critical flyover bridges at the interchange, addressing complex operational and spatial requirements. Both bridges were curved structural steel plate girder design with the longest being the tri-level bridge that spans 1,173 feet over I-490, Union Pacific Railroad, Central Pacific Railroad and York Road.

The bridges were designed using system analysis for the curved steel girder superstructure and 3-D finite element modeling for the substructure. Advanced analysis tools, such as MDX and LEAP Bridge Steel, were used to validate the designs with precision. Comprehensive 3-D visualization demonstrated how the bridges will integrate with existing infrastructure and architectural elements, streamlining the approval process and securing local stakeholder support.

By The Numbers

  • $400

    Million Total Construction

  • 6

    Flyover Ramps

  • 9

    Ramp Bridges

Solutions

Engineering Project Management

At Stanley Consultants, our project management solutions deliver projects on time, within budget, and within the specifications our clients are seeking. We have a proven track record of successfully managing complex projects across industries ranging from energy to water to transportation. Our methodologies are designed to ensure an efficient workflow, mitigate risk and address the needs of all stakeholders. Stanley Consultants is an innovative, experienced project management partner you can trust.